欧美激情性做爰免费视频-国产亚洲精品a在线无码-国产成人在线网站-天堂精品视频-欧美群妇大交群-粗大黑人巨精大战欧美成人-国产精品自产av一区二区三区-欧美99-成人网站www污污污网站直播间-婷婷六月丁-亚洲美腿丝袜无码专区-精品超清无码视频在线观看-日韩色吧-欧美日韩a v-日本大香伊一区二区三区

Home AboutUs Exhibition
Info
News
Center
Exhibitor
Manual
Cost of
Participation
Floor
Plan
Exhibition
Retrospect
Media
Support
Contact Chinese
 News Type
Exhibition News
Industry News
Company News
Media reports
 New Detail
     
New Pacific Metals Drill Results for Silver Sand Project in Bolivia- The 21st China (Guangzhou) Int’l Plate metal, Bar, wire, Metal Processing &Setting Equipment Exhibition
3/2/2020  金屬板材展-棒材-線材展 -plate metal expo-wire expo
---------------------------------------------------------------------------------------------------------------
    New Pacific Metals Corp announced assay results from the final 37 drill holes from its 2019 resource definition and discovery drill program at its wholly-owned Silver Sand Project in Potosí in Bolivia. Drilling continues to return broad intervals of near-surface, structurally controlled, silver mineralization within which higher grade zones occur. The 2019 program successfully confirms mineral continuity and defines several high-grade zones on the property: mineralization remains open for expansion to the North and South and at depth. To date no distinctive feeder zones have been intersected. Given the significant drilling in 2018 to 2019, this indicates the presence of a large silver-rich mineral system. 

Highlights include:
DSS525021, 279.25m @ 91g/t Ag from 4.9m to 284.15m,
incl. 15.4m @ 657g/t Ag from 217.55m to 232.95m;
DSS522513, 108.98m @ 228g/t Ag from 40.32m to 149.3m,
incl. 54.46m 414g/t Ag from 43.84m to 98.3m;
DSS527505, 78.2m @ 245g/t Ag from 40.1m to 118.3m,
incl. 28.44m @ 335g/t Ag from 43.3m to 71.74m,
incl. 13.2m @ 541g/t Ag from 83.1m to 96.3m;
DSS507510, 79.87m @ 122g/t Ag from 58.98m to 138.85m;
DSS505019, 91.49m @ 142g/t Ag from 67.31m to 158.8m;
DSS5223, 56.34m @ 219g/t Ag from 73.36m to 129.7m;
DSS422505, 57.26m @ @160g/t Ag from 86.9m to 144.16m;
DSS4211, 66.25m @ 197g/t Ag from 95.02m to 161.27m;
DSS407502, 67.88m @ 218g/t Ag from 90.12m to 158.00m,
incl. 12.34m @ 496g/t Ag from 137.0m to 149.34m;

In 2019, 42,604 metres of diamond drilling in 167 boreholes was completed on the Silver Sand Project. Total drilled metreage since project inception equates to 91,662 metres in 362 diamond drillholes, one of the largest green-field exploration drill campaigns in Latin America during the period. This news release contains the results of the remaining 37 holes from the Silver Sand deposit with many of the holes drilled off-section to test the intra-section continuity of mineralization.

The off-section holes were collared at azimuth’s ranging from of 91 to 125 degrees and dips from -40 to -45 degrees. Details of drill locations and specifications are provided in Table-2 below. The drill results continue to return wide, high grade, intersections indicative of good to excellent mineral continuity (details in Table-1). 金屬板材展-線材展-金屬加工展-2020第二十一屆廣州國際金屬板材、棒材、線材及金屬加工設備展—全球三大金屬展之一巨浪展覽 -- The 21st China (Guangzhou) Int’l Plate metal, Bar, wire, Metal Processing &Setting Equipment Exhibition Plate metal exhibition, Plate metal expo,2020 Plate metal exhibition,2020 Plate metal expo, Bar exhibition, Bar expo,2020 Bar exhibition,2020 Bar expo, China Bar exhibition, China Bar expo, wire exhibition, wire expo,2020 wire exhibition,2020 wire expo, Metal Processing exhibition, Metal Processing expo,2020 Metal Processing exhibition,2020 Metal Processing expo, China Metal Processing exhibition, China Metal Processing expo.
Copyright © 1996-2025  JULANG.COM.CN Stone Rich Sight. All Rights Reserved
Add:Room 3A05-3A06,Building A1,Xinghui Park,Huaming Road 29,Pearl River New City,Guangzhou,510623,China