欧美激情性做爰免费视频-国产亚洲精品a在线无码-国产成人在线网站-天堂精品视频-欧美群妇大交群-粗大黑人巨精大战欧美成人-国产精品自产av一区二区三区-欧美99-成人网站www污污污网站直播间-婷婷六月丁-亚洲美腿丝袜无码专区-精品超清无码视频在线观看-日韩色吧-欧美日韩a v-日本大香伊一区二区三区

Home AboutUs Exhibition
Info
News
Center
Exhibitor
Manual
Cost of
Participation
Floor
Plan
Exhibition
Retrospect
Media
Support
Contact Chinese
 News Type
Exhibition News
Industry News
Company News
Media reports
 New Detail
     
BF and BOF Upgrade at Chelyabinsk Metallurgical Plant of Mechel- The 21st China (Guangzhou ) Int’l tube & pipe Processing Equipment Exhibition
3/16/2020  -steel tube expo-tube &pipe expo
---------------------------------------------------------------------------------------------------------------
    Mechel has reported launching 2 upgraded key facilities at Chelyabinsk Metallurgical Plant blast furnace #4 and converter #1. Investment totaled RUB 4.5 billion. Both facilities were practically rebuilt as part of the technical upgrade. It included full dismantling of the blast furnace and all equipment, assembly of a new jacket and cone, replacement of the furnace brickwork and cooling system, installment of a new equipment for loading iron ore and coke, as well as a modern automated operating system now all of the furnace’s parameters are subject to computer control and are displayed on a monitor. Improving environment friendliness was a particular concern during the revamp, with a new three-step gas cleaning system installed.

It is fully leak-proof and prevents combustion gases from escaping into the atmosphere. Blast-furnace gas that is formed during pig iron smelting is then used as fuel. The blast furnace #4’s capacity is 1.1 million tonnes of pig iron a year. Investment in its upgrade totaled RUB 1.5 billion. The company now launched the 2nd stage of its upgrade, construction of a suction system for the casthouse, which will completely prevent leaks of any solids from the blast furnace #4 into the atmosphere.

Works at the converter #1, incluluding replacing the converter’s vessel shell, cooling stack and flux handling route for smelting weight increase and steelmaking efficiency. The upgrade also tackled one of its key tasks, providing the converter with a modern 3-step gas cleaning system, which enables the plant to minimize emissions of waste produced in the steelmaking process. The converter’s annual capacity is 1.3 million tonnes. Investment in its upgrade totaled 3 billion rubles, with 1.5 billion of those funding ecological measures that will decrease the converter’s waste emissions by more than 30%.

After the converter #1’s upgrade and once the 2nd stage of the blast furnace #4’s technical upgrade is complete, Chelyabinsk Metallurgical Plant’s total waste emissions will go down by 116 tonnes a year. 管材展-鋼管展-2020廣州國際管材及管材加工設(shè)備展-中國展出效果最好的管材展-巨浪展覽 - The 21st China (Guangzhou ) Int’l tube & pipe Processing Equipment Exhibition -Tube exhibition, Tube expo,2020 Tube exhibition,2020 Tube expo, China Tube exhibition, China Tube expo, pipe exhibition, pipe expo, 2020 pipe exhibition,2020 pipe expo, China pipe exhibition, China pipe expo, Guangzhou pipe exhibition, Guangzhou tube exhibition, Guangzhou pipe expo, Guangzhou tube expo 
Copyright © 1996-2025  JULANG.COM.CN Stone Rich Sight. All Rights Reserved
Add:Room 3A05-3A06,Building A1,Xinghui Park,Huaming Road 29,Pearl River New City,Guangzhou,510623,China