欧美激情性做爰免费视频-国产亚洲精品a在线无码-国产成人在线网站-天堂精品视频-欧美群妇大交群-粗大黑人巨精大战欧美成人-国产精品自产av一区二区三区-欧美99-成人网站www污污污网站直播间-婷婷六月丁-亚洲美腿丝袜无码专区-精品超清无码视频在线观看-日韩色吧-欧美日韩a v-日本大香伊一区二区三区

Home AboutUs Exhibition
Info
News
Center
Exhibitor
Manual
Cost of
Participation
Floor
Plan
Exhibition
Retrospect
Media
Support
Contact Chinese
 News Type
Exhibition News
Industry News
Company News
Media reports
 New Detail
     
RCP Replaces 20-Year Old Plastic System in Florida- The 20th China (Guangzhou ) Int’l tube & pipe Processing Equipment Exhibition
4/4/2019  管材展-鋼管展-steel tube expo-tube &pipe expo
---------------------------------------------------------------------------------------------------------------
    

poor drainage conditions and structural deficiencies in a 70-foot single run and 790-foot double run 54-inch diametercorrugated HDPE drainage pipe threatened the storm sewer’s failure in the CrownPointe Commerce Park in early 2018. Engineers recommended removal of more than half the failing system and replacing it with concrete pipe.

Poor drainage conditions and structural deficiencies in a 70-foot single run and 790-foot double run 54-inch diametercorrugated HDPE drainage pipe threatened the storm sewer’s failure in the CrownPointe Commerce Park in early 2018. Engineers recommended removal of more than half the failing system and replacing it with concrete pipe.

In one section of the failing pipeline, and only “if expedient measures are taken,” the engineers gave the option of a structural liner or replacement with concrete pipe. According to the engineering analysis, the pipes were “FAILED” with one “active collapsed area.”

Past problems at CrownPointe indicated issues underground. The alignment of the drainage easement traverses the parking lot of a warehouse occupied by a prominent moving company and a major overnight shipping company. A truck court occupies the easement where tractor-trailers park and maneuver into cargo bays. The overnight delivery company’s employees recalled an incident in which a section of the parking lot collapsed, resulting in a “hole” beneath the truck cab’s front tires during a cargo transfer operation. They did not report any injury or property damage, but the driver managed a shimmy-shuffle maneuver to extract the truck.

Original Design

The original drainage system was designed in 1998. The engineer’s plans indicate the double run of 54-inch HDPE pipe had between 2.5 feet to 4 feet of backfill cover from finished grade to top of pipe. The current version of ASTM D2321 requires 54 inches of cover (one diameter) for 54-inch plastic pipe. Based on site observations during removal and replacement, the parallel spacing between the plastic pipes was approximately half a pipe diameter. The plastic pipe industry recommends 27 inches spacing between parallel 54-inch plastic pipes. For concrete pipe, spacing between parallel pipe runs is not of great concern because concrete pipe is less dependent on lateral soil support than plastic pipe. The Engineer of Record, however, and not a pipe vendor’s generic table, is ultimately responsible for specifying the proper pipe envelope dimensions, soil types and compaction requirements to ensure a resilient structural system 管材展-鋼管展-2019廣州國際管材及管材加工設(shè)備展-中國展出效果最好的管材展-巨浪展覽 - The 20th China (Guangzhou ) Intl tube & pipe Processing Equipment Exhibition -Tube exhibition, Tube expo,2019 Tube exhibition,2019 Tube expo, China Tube exhibition, China Tube expo, pipe exhibition, pipe expo, 2019 pipe exhibition,2019 pipe expo, China pipe exhibition, China pipe expo, Guangzhou pipe exhibition, Guangzhou tube exhibition, Guangzhou pipe expo, Guangzhou tube expo  .